How to edit the Schedule of a Report

How to edit the Schedule of a Report

How to edit the Schedule of a Report

Schedule for Reports can be edited even after they have been configured

For Administrators

  1. Log in to Learn LMS and click "Reports" tab from the top
  2. From the list of reports Search for the Report for which you wish to edit schedule.
  3. After you have found the report, hover over the three dots and click "Edit Schedule"mceclip1.png
  4. Set Frequency of report - Daily, weekly on Monday, Weekly same day as today, Every weekday, Annually
  5. Add other Recipients for the report if required. Everyone shall get an email when the report is generated
  6. Click "Save"mceclip0.png

For Managers

Managers can also generate scheduled reports for different entities User / Teams / CoursePath / Events / Organization)  for his/her team members. An Admin can also make Manager(s) as the recipient for any scheduled report which is active. 

Follow instructions given in "For Administrators"

For Learners

Learners cannot configure Scheduled reports. An Admin/Manager can make learner(s) as the recipient for any Scheduled report which is active.



    • Related Articles

    • How to schedule an Organization Report

      How to schedule an Organization Report Admin can now schedule Organization reports to run as per their desired time interval and even add recipients who will automatically receive them via email. For Administrators Log in to Learn LMS and click ...
    • How to set recipients for a Scheduled Report

      How to set recipients for a Scheduled Report Recipients can be added for Scheduled Reports by the Admin. This option will help Admins to enable managers to receive relevant reports at their required time interval instead of them (Admin/Manager) ...
    • How to Schedule Reports

      How to Schedule Reports If a specific kind of report is being regularly exported, you can Schedule it in the LMS to auto run as per the required time interval. For Administrator Configure a Scheduled Report Set Frequency of report - Daily, weekly on ...
    • Where can I download a Report (Scheduled/Non-Scheduled) that was generated in the past

      Where can I download a Report (Scheduled/Non-Scheduled) that was generated in the past All reports generated in the LMS (Scheduled/Non Scheduled) shall be stored if in case we ever need to verify/access them. For Administrators Log in to Learn LMS ...
    • How to Stop/Pause or Restart/Set a Scheduled Report

      How to Stop/Pause or Restart/Set a Scheduled Report Scheduled Reports can be stopped and restarted by Admins whenever required depending on the need. For Administrators Stop/Pause Schedule Log in to Learn LMS and click "Reports" tab from the top From ...